Excavation Scheme for a Deep Wagon Tippler at Jawaharlal Nehru Port Trust, Bombay

Excavation Scheme for a Deep Wagon Tippler at Jawaharlal Nehru Port Trust, Bombay
Über dieses Buch
  • Art: Studienarbeit
  • Autor: Thoralf Schlüter
  • Abgabedatum: Mai 2000
  • Umfang: 122 Seiten
  • Dateigröße: 4,1 MB
  • Note: 1,3
  • Institution / Hochschule: Technische Universität Hamburg-Harburg Deutschland
  • ISBN (eBook): 978-3-8324-8756-0
  • ISBN (Paperback) :
    978-3-8324-8756-0 P
  • ISBN (CD) :978-3-8324-8756-0 CD
  • Sprache: Englisch
  • Prämierung:
  • Arbeit zitieren: Schlüter, Thoralf Mai 2000: Excavation Scheme for a Deep Wagon Tippler at Jawaharlal Nehru Port Trust, Bombay, Hamburg: Diplomica Verlag
  • Schlagworte: Baugrube, Schlitzwand, Indien, Hafen, Erdbeben

Studienarbeit von Thoralf Schlüter

Introduction:

The Jawaharlal Nehru Port Trust, called JNPT, is situated close to Mumbai (former name Bombay) at the same channel used by Mumbai Port and Jawahar Dweep Oil Terminal. It is the youngest and most modern port of India. Commissioned in May 1989, the port still has high development ambitions especially in the sector of expansion, which is necessary in view of its purpose of decongesting Mumbai Port and the serving as a Hub Port for this region. The new Nhava Sheva Container Terminal Project is an example for the continuous progress in realising these plans.

In carrying out of these plans, structures like deep wagon tippler are required for managing bulk cargoes at the bulk terminals. This type of structure allows an economical unloading of cargoes from trains. Because of the necessary depth of a wagon tippler the cargoes have to surmount a difference in altitude of about 12 m from ground level and additional the difference in altitude from ground level up to the vessel. This can only be done by using long conveyor tunnels. An elevation of the cross section for a typical deep wagon tippler, borrowed from an existing structure.

In the first part of this project work, a review on different, often used schemes, for deep excavations is done to find out a favourable excavation scheme for construction of a deep wagon tippler. The choice for a structure using RCC diaphragm walls as retaining walls is based on its merits under the existing soil conditions and on a possible serving as part of the final structure. During a site visit to JNPT the decision for this type of excavation scheme was discussed with site engineers, who have experience in constructing RCC diaphragm walls under existing soil and groundwater conditions.

Finally an analysis of a typical cross section of the deep wagon tippler has been carried out by using the structural engineering software STAAD III, based on the Finite Element Method. The safety of the structure against failure caused on external and internal loads is proofed as well as for the case of an earthquake, which will be very possible, because of the location of the site in the earthquake zone four.

SUMMARY:

The aim of this project work was to work out an excavation scheme for the construction of a deep wagon tippler at JNPT Mumbai under actual loading condition. For solving this problem, first a comparison of different schemes for deep excavations was done. The final choice of using diaphragm walls supported by a deck slab as excavation scheme was based on its economical and structural merits compared with other types. During the site visit at JNPT a professional construction of a diaphragm wall could be studied. Discussions with site engineers were helpful to decide for this type of structure.

To find out a safety and economical structure, analyses for different types of diaphragm walls were done. In five steps the first structure, diaphragm walls with rectangular cross section and height of 25.6 m, connected with a deck slab, was modified to reach an optimal result in consideration of economical and static aspects. The choice of T-sections for the walls to take the large bending moments based on earth pressure, water pressure, dead load, live load and additional loads for earthquake case, turned out to be better than a rectangular section. It was possible to reduce the high deflection values of the walls. Comparing the T-sections with a thickness of 2.5m and 3.0m it was favourable to choose the light weightier structure.

A lighter structure will give a higher stability in case of earthquakes, so deflection values were almost the same. The saving of material and working time will help to make the structure more economical. A final depth for founding the structure turned out to be the best at level –15.10 m (height of the wall amounts to 22.2 m). In this depth the layer of basalt rock gives a sufficient support to the diaphragm walls and a cost-effective construction will be possible. Supplementary to the analysis, carried out in this project, the structure has to be proofed for its static stability during the construction phase. For taking the high uplift force additional structural measures like pile foundations have to be worked out and finally a settlement analysis has to be done before designing the structure.

Table of Contents:

Certificate i
Acknowledgement ii
Abstract iii
List of Figures vi
List of Tables vii
List of Photographs vii
List of Symbols viii
Chapter I. GENERAL Introduction 1
Chapter II. Alternative Schemes for Deep Excavation 3
2.1 Introduction 3
2.2 Open Excavation 4
2.3 Excavation after Soil Stabilization 4
2.4 Sheet Pile Wall 5
2.5 H–Beam Wall 6
2.6 Bored Pile Wall 8
2.7 Diaphragm Wall 9
2.8 Final Choice of Excavation Scheme 12
CHPATER III. Site Visit at JNPT Mumbai 13
CHAPTER IV. Analysis of Soil Data 17
4.1 Introduction 17
4.2 Soil Condition on site 17
4.3 Calculation of Earth Pressure 19
4.4 Calculation of Differential Water Pressure 21
CHAPTER V. Analysis of Deep Wagon Tippler 23
5.1 Introduction 23
5.2 Calculation of Soil Springs 24
5.3 Calculation of Seismic Force 27
5.4 Calculation of Total Pressures per Panel 28
5.5 FEM-Analysis of the Structure (STAAD-III Package) 30
5.6 Analysis Results and Discussion 32
CHAPTER VI. Summary 37
Appendices A & B 39
References 107

Arbeit zitieren:
Schlüter, Thoralf Mai 2000: Excavation Scheme for a Deep Wagon Tippler at Jawaharlal Nehru Port Trust, Bombay, Hamburg: Diplomica Verlag

Schlagworte:
Baugrube, Schlitzwand, Indien, Hafen, Erdbeben

diplom.de
Bachelor + Master Publishing

Hermannstal 119 k
22119 Hamburg

Fon: +49 (0) 40 655992-0
Fax: +49 (0) 40 655992-22

Service-Telefon

Rufen Sie uns an:
+49 (0) 40 655992-0

Mo-Fr
09.00-16.00 Uhr

diplom.de in den Medien

Folgen Sie uns bei Twitter & werden Sie diplom.de-Fan bei Facebook!
Schreibtipps unserer Lektoren, Neuigkeiten aus dem Verlagsalltag und das Expertenwissen unserer Autoren als Tweet & Post!
Wir freuen uns auf Sie!

diplom.de BACHELOR + MASTER PUBLISHING

Bachelorarbeiten, Masterarbeiten, Diplomarbeiten, Magisterarbeiten, Dissertationen und andere Abschlussarbeiten aus allen Fachbereichen und Hochschulen können Sie bei uns als eBook sofort per Download beziehen oder sich auf CD oder als Buch zusenden lassen. Seit mehr als 15 Jahren ist diplom.de der seriöse, professionelle und erfolgreiche Partner für die Veröffentlichung wissenschaftlicher Abschlussarbeiten.

© Diplomica Verlag GmbH 1996-2011, AG Hamburg HRB 80293 - GF Björn Bedey, USt-IdNr.: DE214910002 - Verkehrsnummer: 12285 - Impressum
Index der Arbeiten - Index der Autoren